Cameron Construction provided construction services at the George E. Wahlen VA Medical Center. The project included selective demolition and remodel of an area for a new Phillips Digital Diagnost TH equipment. Construction Manager: H&H Design-Build read more...

Cameron Construction completed this project 6 weeks ahead of the contracted date of completion. The project included a complete change in the front entrance and lobby area including new offices, admissions, snack bar, pharmacy and gift shop. Project included significant renovation of this area with close coordination with architect, engineers and owner representative. Architect: Architectural Nexu...read more...

Cameron Construction completed the remodeling the Fillmore & Delta Medical Centers for Intermountain Health Care (IHC). Scope of work included the construction of new front entrances for both facilities, net MRI room and selected interior remodeling of both facilities. Architect: JRCA Architects Delta Fillmore read more...

Cameron Construction completed a project for IHC at their TOSH Facility. The project consisted of a complete remodel of the MRI Suite. Architect: JRCA Architects read more...

Cameron Construction was awarded another project with GE with an additional tenant build out on the 6th floor at the IMC Complex in Murray. The project was fast paced as the client required the space to meet its growing needs. Architect: Architectural Nexus read more...

The project consisted of 72 units with 4 wings of living space. Two wings of the facility is an Assisted Living facility while the other two wings is for Senior Independent Living with one and two bedroom apartments for seniors. Common areas include a dinning area, activity area, ice cream parlor and a hair salon. In addition there are offices and commercial kitchen. Project was completed in July 2011. Architect: L.K. Sorsensen Associates Click HERE ...read more...

This project included the addition of an additional operating room for the Park City Medical Center. Architect: Architectural Nexus read more...

Cameron Construction converted a former bank facility into an IHC Instacare Facility in Tooele, Utah Architect: VCBO Architects read more...

New access road for existing clinic including clearing, grading, curb and gutter, asphalt paving, utilities, and landscaping. read more...

Cameron Construction is in the process of renovating the IHC Sandy Clinic adjacent to Alta View Hospital. The scope includes exterior and interior remodeling of the facility. read more...

Cameron Construction has been involved with several projects at the LDS Hospital. Most recently the 7th Floor Joint Replacement and the 8th Floor Bone Marrow Transplant. Extensive renovation of both floors to accommodate the associated clinics, patient rooms, nursing stations, physical therapy rooms, and common areas. Architect: Architectural Nexu...read more...

Cameron Construction completed a major renovation of the 1st floor of the LDS Hospital. Areas included several clinics, offices, waiting areas, hallways and exam rooms. The project also included major upgrades to mechanical and electrical systems. Completion Date: February - 2011 Architect: Architectural Nexu...read more...

40,000 SF tenant build out of 3 floors at the new Intermountain Health Care Medical Center. Project included executive offices, workstations and conference and meeting rooms. It also included a physician’s gym with locker rooms. Architect: Architectural Nexu...read more...

This new facility was a two story with basement which included 30 patient rooms with bathrooms, two dining areas, administrative offices, therapy pool, physical therapy room with a commercial kitchen and laundry. Architect: L.K. Associate...read more...

PET/CT SCAN Addition. Addition to the hospital for the PET/CT Scan Clinic. Included in the 5,200 SF addition is 2 scan rooms with a central control room, administrative area, research work stations and ‘hot’ lab room. Project required close coordination with the hospital staff and public during construction. Architect: Architectural Nexus read more...

Ongoing interior remodeling of offices and manufacturing areas. Estimated Completion Date: May – 2010 Photographs of project unavailable. read more...

MRI Imaging building, included site work, installation of modular building with MRI scanner and associated finish work. Architect: Kings Medical read more...

Cameron Construction built this new 36,000 SF retirement center. The facility has 47 private living quarters. These units are supported by kitchen, recreation, craft areas and administrative offices. Architect: L.K. Associates read more...

Two story addition to existing hospital for office and outpatient clinics. The site was very tight and required close coordination of subcontractors. The facility remained open during construction. Architect: Design West Architects read more...

New two story office building addition to an existing care facility. Wood framed construction with brick veneer and stucco exterior finish. Complete electrical and mechanical systems with office finishes. Architect: Pace Pollard Architects read more...

Remodel of existing east wing bathrooms, nurse stations and corridors with a complete addition of a dining facility. Architect: Pace Pollard Architects read more...

Renovation of the 5th floor school of nursing. Project included two phases of offices and classrooms. read more...

Remodel of 33,000 SF OB/GYN and TCU clinics on the second floor of the hospital. New addition for the MRI department and 6 doctor office suites with exam rooms. Architect: L.K. Associate...read more...

Tenant build out of a medical clinic which included exam rooms, reception area and offices. Architect: Architectural Nexus read more...

Cameron remodeled several of their health care facilities along the Wasatch Front over the past several years. The typical scope of work for each facility included patient rooms, common areas, restroom and shower facilities and exterior windows and façade. All the work was completed while the facilities remained open. read more...