Chevron

Chevron Refinery – SLC

Cameron Construction completed several projects during the past year at Chevron Refinery in Salt Lake City including the renovation of the control room while it remained operational.  This required very close coordination with all team members to ensure the safety of all workers.  Chevron is very a tuned to the need for safety and they have developed safety procedures and protocols that require everyone working at the refinery to closely adhere to them.  Cameron Construction also has a strong commitment to safety....read more...

Union Pacific Maint

Union Pacific Railroad Intermodal Distribution Center

Light industrial buildings and structures at a major Union Pacific Railroad truck-rail transfer facility on the west side of Salt Lake City.  Total of eight structures including Gate Administration Building with offices, communications and dispatcher.  Maintenance building with large locker rooms & showers, high-bay repair facility with parts storage mezzanine and oil/storm water collection for treatment.  Industrial waste treatment building with process vaults, pumps, weir and storage tanks, and bridge crane rails.  Two security gate canopies over four lanes. Architect:  Hanson-Wilson, ...read more...

Lafavor

Lefavor Envelope Company

Cameron built a 16,550 SF warehouse addition and renovated the adjacent office space and printing plant. Architect:  Timmerman & Associates read more...

Amsco aerial

Amsco Windows Manufacturing Plant

This project was an addition to the current manufacturing plant.  The project included warehouse space, parking and landscaping on a four (4) acre site. The owner required un-interrupted access to their two primary material supply docks, which were enclosed during this project.  This required close coordination between the owner and the Cameron team so construction could proceed around the daily deliveries. Architect:  Coles Architects read more...

National Wood

National Wood Warehouse

Cameron built this new 101,000 SF Concrete-Tilt-up building with warehouse, offices and canopy on 6-acre site with rail spur. (Negotiated project, CM/GC). Architect:  Smith Layton & Associates read more...

WFS plenum ceiling three

LDS Church – Welfare Square

Site Work This was a multi-phased project that included excavation, site work and demolition of an old cannery.  The site work also included parking areas, decorative lighting, landscaping, ornamental benches and fencing. Architect:  Butler & Evans Deseret Industries Building 18,500 SF addition and interior remodel of an existing building.  Seismic upgrades of building to include new electrical, mechanical and plumbing systems. Cannery Two million dollars of stainless steel equipment cleans, peels, cooks, cools, sterilizes and bottles applesauce, spaghetti sauce, salsa ...read more...

DSC_0652

Air Liquide

Cameron has completed two projects for Air Liquide.  The first project was a 4,250 SF pre-engineered metal building that included a 32 foot eave height with a twenty ton overhead bridge crane.  Electrical distribution system including a ventilation and heating systems to cool five air compressors with a control room office.  The second was a pre-engineered water treatment building. Architect:  James B. Glascock Architect read more...